0

I’ve noticed that some generating stations have "generation schedules" and similar schedules also exist for load distribution stations. They usually have a MW amount telemetered to the ISO (grid operator) for each operating hour. How do they determine these values in their schedules knowing that they could change throughout the day? What significance do they have?